REBROVO - SVOGE
Railway line

REBROVO - SVOGE
Railway line

Complete renewal of the railway and contact network in the Rebrovo - Svoge inter station section from km 24 + 589 to km 32 + 573, with a total length of 7984 m. The activities include replacement of the rail-traverse grid /incl. construction of a continuous welded rail track/, construction of an 8 km drainage system, restoration of earth ditches, construction of fortifications and networking of rock massifs, strengthening of all "weak places" along the route. Reconstruction of 450 m of retaining walls was carried out and new retaining structures with a length of 300 m were built. A stone bridge was repaired, 35 culverts were rehabilitated and repaired. Thompson and Orlin stops have been completely newly built, with platforms of 150 m each. Two crossing facilities have been replaced and re-equipped. The railway, contact network, drainage facilities and markings in 3 tunnels were newly built.