ROSENETS Port terminal, Bourgas

The project is divided and implemented in 3 stages:

Stage 1:

  • Construction of three tanks: one for diesel fuel with a capacity of 50 000 m³ with floating roof, one for low-octane gasoline (LOG) with a capacity of 30 000 m³ with hard roof and pontoon, and one for oil with capacity of 50 000 m³ with floating roof

Stage 2:

  • Technological upper-header for the passage of pipelines and construction for a cable route that includes low and high supports for crossing roads. Executed were several types of reinforced concrete foundations, metal supports for high crossings and metal supports for cableways.
  • Technological upper-header for the passage of pipelines that includes low and high supports for crossing roads.

Stage 3:

  • Site 1-tank for LOG 30 000 m³ and Diesel tank 50 000 m³
  •  Site 2 – Oil tank 50 000 m³
Back to projects