Your reliable partner
Home / Projects / Metro town of Sofia, 2-nd metro diameter, Metro station 3
IMG_4064 IMG_4067 metro-2diameter-3 (35) metro-2diameter-3 (36) metro-2diameter-3 (40) metro-2diameter-3 (42) metro-2diameter-3 (52) metro-2diameter-3 (50) metro-2diameter-3 (39) metro-2diameter-3 (1) metro-2diameter-3 (3) metro-2diameter-3 (4) metro-2diameter-3 (5) metro-2diameter-3 (10)

Metro town of Sofia, 2-nd metro diameter, Metro station 3

Client: Metropoliten EAD
Executor: GP Group LTD. through Metro Build 2010 Consortium
Started at: 05.02.2010 г.
Finished at: 05.12.2011 г.

Metro – Town of Sofia, 2nd metro diameter – underground track and Metro station 3

Metro Station – 3 has two underground levels of length 47.60 m, width 36.70 m and h = 9 m, the station platform is 105 m long. The construction of the underground infrastructure is executed as position from km 1+300 to km 1+800 with range: construction of Metro tunnel, underground Metro Station II-3, underground parking, as well as reorganization and reconstruction of underground and ground infrastructure in the area of the site affected by the construction works.