Your reliable partner
Home / Projects / Metro city of Sofia, 2-nd metro diameter, metro station 2
metro-2diameter2 (53) IMG_4070 fix metro-2diameter2 (46) metro-2diameter2 (47) metro-2diameter2 (52) metro-2diameter2 (48) metro-2diameter2 (41) metro-2diameter2 (13) metro-2diameter2 (22) metro-2diameter2 (27) metro-2diameter2 (31) metro-2diameter2 (37) metro-2diameter2 (9) metro-2diameter2 (8) metro-2diameter2 (6) metro-2diameter2 (3)

Metro city of Sofia, 2-nd metro diameter, metro station 2

Client: Metropoliten EAD
Executor: GP Group LTD. through Metro Build 2010 Consortium
Started at: 17.06.2011 г.
Finished at: 17.08.2012 г.

CM-2 has three levels with length 141.5 m, width 24.80 m and h = 13,55 m. Connected with an underground garage. Powered construction of underground infrastructure such position km 1 +300 to km 1 +800 range: underground subway station II-2, underground parking, and reconstruction and rehabilitation of ground and underground infrastructure in the area of the site affected by construction.